A useful set of performance measurements for Safety, Productivity and Control has evolved at the Fast Flux Test Facility (FFTF). In response to declining budgets and the resulting need to safely manage a manpower rampdown, an ''Early Warning System'' was developed in 1984. Its purpose was to monitor the effects of the staffing rampdown such that appropriate remedial action could be taken to correct adverse trends before a significant problem occurred. 1 tab.

Open-access reader

About this research paper

What this paper is about

A useful set of performance measurements for Safety, Productivity and Control has evolved at the Fast Flux Test Facility (FFTF). In response to declining budgets and the resulting need to safely manage a manpower rampdown, an ''Early Warning System'' was developed in 1984. Its purpose was to monitor the effects of the staffing rampdown such that appropriate remedial action could be taken to correct adverse trends before a significant problem occurred. 1 tab.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A useful set of performance measurements for Safety, Productivity and Control has evolved at the Fast Flux Test Facility (FFTF). In response to declining budgets and the resulting need to safely manage a manpower rampdown, an ''Early Warning System'' was developed in 1984. Its purpose was to monitor the effects of the staffing rampdown such that appropriate remedial action could be taken to correct adverse trends before a significant problem occurred. 1 tab.

Key concepts: Remedial action, Staffing, Productivity, Control (management), Test (biology), Remedial education, Operations management, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
FFTF (Fast Flux Test Facility) performance measurements for safety, productivity and control — Research Paper | ScholarLens