The use of prefabricated bridge structures in order to allow projects to meet tight deadlines is illustrated in the replacement of two small bridges in Avon and Summit County, Ohio. While each structure was replaced under unique circumstances using different project-delivery methods, they both used a prefabricated alternative to speed construction. Important considerations in using prefabrication, in general, are discussed in this article, as well as details and challenges in the construction of these two bridges, in particular.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The use of prefabricated bridge structures in order to allow projects to meet tight deadlines is illustrated in the replacement of two small bridges in Avon and Summit County, Ohio. While each structure was replaced under unique circumstances using different project-delivery methods, they both used a prefabricated alternative to speed construction. Important considerations in using prefabrication, in general, are discussed in this article, as well as details and challenges in the construction of these two bridges, in particular.
Key concepts: Prefabrication, Bridge (graph theory), Summit, Engineering, Construction engineering, Civil engineering, Transport engineering, Architectural engineering